10/31/18
7th Grade:
Bellwork: What is the first step in the Engineering Process?
The first step in the engineering process is to______________.
Planner:
- Machine Engineering Challenge: Final day to build.
- Begin Engineering/Collaboration worsheet –due tomorrow, Thursday (11/1). This assignment is worth half (15pts) of the summative grade (30pts) for this group project.
HW:
- Engineering/Collaboration worksheet If you aren’t finished in class.
- Engineering Design Study Guide.Study Guide Engineering and Design quiz
- I will also be collecting your lab report from day 1 and the cause and effect flow chart from day 2 of the machine challenge tomorrow (11/1).
Quiz: Friday Nov. 2.
Categorised as: Blogs
Leave a Reply