{"id":102,"date":"2018-09-19T16:32:35","date_gmt":"2018-09-19T20:32:35","guid":{"rendered":"https:\/\/iblog.dearbornschools.org\/robertl1\/?p=102"},"modified":"2018-09-19T16:35:13","modified_gmt":"2018-09-19T20:35:13","slug":"wednesday-sept-19th","status":"publish","type":"post","link":"https:\/\/iblog.dearbornschools.org\/robertl1\/2018\/09\/19\/wednesday-sept-19th\/","title":{"rendered":"Wednesday, Sept. 19th"},"content":{"rendered":"<p><strong>6th Grade Science<\/strong>\u00a0\u2013<br \/>\nThis week, we\u2019ll be working on a bridge building project, where we will design and construct a handmade bridge in class.<br \/>\n<em><strong>Homework<\/strong>\u00a0\u2013<br \/>\n<strong>9\/19<\/strong> &#8211; No homework today due to NWEA testing.<br \/>\n<strong>9\/20<\/strong> &#8211; As a team, students will need to finish up their bridge group work packet in class &#8211; what isn&#8217;t completed in class will need to be finished for homework. Additionally, students will need to complete their bridge reflection worksheet. The bridge project packet and the reflection sheet are both due by the end of class on Friday.<\/em><\/p>\n<p><strong>STEM Apps \u2013<\/strong><br \/>\nThis week, we\u2019ll be working on Phase 1 of our Geometrocity Project, where students will create urban planning designs and 2-D blueprints.<br \/>\n<em><strong>Homework \u2013<br \/>\n<\/strong><\/em><em><strong>9\/19<\/strong> &#8211; No homework today due to NWEA testing.<br \/>\n<strong>9\/20<\/strong> &#8211; As a team, students will need to finish up their Geometrocity Phase 1 work packet in class &#8211; what isn&#8217;t completed in class will need to be finished for homework. Additionally, students will need to complete their map analysis worksheet. The Geometrocity Phase 1 project packet and the map analysis worksheet are both due by the end of class on Friday.<\/em><\/p>\n<p>Have a great day!\u00a0\ud83d\ude42<\/p>\n","protected":false},"excerpt":{"rendered":"<p>6th Grade Science\u00a0\u2013 This week, we\u2019ll be working on a bridge building project, where we will design and construct a handmade bridge in class. Homework\u00a0\u2013 9\/19 &#8211; No homework today due to NWEA testing. 9\/20 &#8211; As a team, students will need to finish up their bridge group work packet in class &#8211; what isn&#8217;t [&hellip;]<\/p>\n","protected":false},"author":2366,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-102","post","type-post","status-publish","format-standard","hentry","category-blogs"],"_links":{"self":[{"href":"https:\/\/iblog.dearbornschools.org\/robertl1\/wp-json\/wp\/v2\/posts\/102","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/iblog.dearbornschools.org\/robertl1\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/iblog.dearbornschools.org\/robertl1\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/iblog.dearbornschools.org\/robertl1\/wp-json\/wp\/v2\/users\/2366"}],"replies":[{"embeddable":true,"href":"https:\/\/iblog.dearbornschools.org\/robertl1\/wp-json\/wp\/v2\/comments?post=102"}],"version-history":[{"count":0,"href":"https:\/\/iblog.dearbornschools.org\/robertl1\/wp-json\/wp\/v2\/posts\/102\/revisions"}],"wp:attachment":[{"href":"https:\/\/iblog.dearbornschools.org\/robertl1\/wp-json\/wp\/v2\/media?parent=102"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/iblog.dearbornschools.org\/robertl1\/wp-json\/wp\/v2\/categories?post=102"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/iblog.dearbornschools.org\/robertl1\/wp-json\/wp\/v2\/tags?post=102"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}