Summative- Stout’s new Wastewater Treatment Facility

DUE 11/28 or 11/29

Create a Power Point Presentation!!!!!  Create a DETAILED Poster!!!

Summative- Design Stout’s New Wastewater Treatment Facility

7.1.0 – 2 – Drought READING Resource Page

Non-Potable and Potable Water

Non- Potable and Potable Water

Filters Used to Clean Toilet to Tap Water

Toilet to Tap Filtration Parts

Video Winnipeg Wastewater Treatment

Toilet To Tap Video

SUMMATIVE ESSAY- FLASHLIGHT DESIGN: DUE 10/27 OR 10/31

CONCLUSION- 3RD PARAGRAPH DIRECTIONS

FLASHLIGHT CONCLUSION (1)

3rd paragraph- Conclusion

Respond to the following-

NO-“it”, “they”, “and”

You may write about your opinions- ***USE WRITING TOOLS FOR SENTENCE STARTERS*****
DO NOT REPEATEDLY BEGIN SENTENCES WITH “I”-

DESCRIBE SOME STRENGTHS AS WELL AS IMPROVEMENTS YOUR ENGINEERING GROUP COULD MAKE AS A TEAM TO WORK PRODUCTIVELY.

3-STRENGTHS…SEPARATE SENTENCES
3-IMPROVEMENTS…SEPARATE SENTENCES

 

directions have been provided  (10/24/17)

DUE DATE CHANGE:  10/27 OR 10/31-  THERE ARE LIMITED DAYS FOR THE USE OF LAPTOPS FOR US TO TYPE

SUMMATIVE FLASHLIGHT ESSAY-

DUE 10/27 or 10/31

DIRECTIONS- USE LINKS BELOW

SUMMATIVE FLASHLIGHT ESSAY DIRECTIONS

IDEAS TO MAKE PARTS FOR CLIENT’S NEEDS

TASK EXPECTATIONS

PRE- SUMMATIVE ESSAY VOCABULARY- DUE 10/20 OR 10/23

DUE DATE CHANGE:  10/19 OR 10/20

TYPE ON GOOGLE DOCS!!!!!  THEN UPLOAD TO GOOGLE CLASSROOM

SUMMATIVE-  UPLOAD TO GOOGLE CLASSROOM

DUE- WEDNESDAY 10/20 OR THURSDAY 10/23

PRE- ESSAY VOCABULARY  -LINK TO VOCABULARY WORDS

ADD 2 MORE WORDS:  CONDUCTOR & INSULATOR

EACH CLASS CONTRIBUTED EXAMPLES-  I WROTE AS STUDENTS OFFERED INFORMATION-

STUDENT LEAD EXAMPLE 1

STUDENT EXAMPLE 2

STUDENT EXAMPLE 3

STUDENT EXAMPLE 4

 

 

 

 

Summative Task- Building A Flashlight

DUE DATE CHANGE TO-  MONDAY, 10/16, TUESDAY, 10/17, OR WEDNESDAY 10/18   ANY OF THE DAYS ARE ACCEPTABLE.

IN-CLASS TIME FOR BUILDING A FLASHLIGHT-SUMMATIVE GRADE

TUESDAY, 10/10, WEDNESDAY, 10/11, THURSDAY, 10/12

STUDENT IDEA TO CREATE CLIENT’S NEEDS-

IDEAS TO MAKE PARTS FOR CLIENT’S NEEDS

10/9/2017-CIRCUIT BASICS TO BUILD A FLASHLIGHT- CONCEPT MAP

COMPLETED FRIDAY, 10/6/2017

CIRCUIT BASICS

DUE DATE- UNDETERMINED AT THIS TIME, WILL BE BASED ON TIMELINE THAT BEST SUITS STUDENTS.  I WILL UPDATE AS WE PROGRESS TO DETERMINE A FINAL DATE

STUDENT DIRECTIONS FOR SUMMATIVE TASK-

BUILDING A FLASHLIGHT STUDENT DIRECTIONS-

TASK EXPECTATIONS RUBRIC-

TASK EXPECTATIONS

 

VIDEO RESOURCES-

https://www.youtube.com/watch?v=tpdOgf7i5XgSimilar